Construction of 22m Span Matope Bridge with Associated Drainage Structures and Rehabilitation of Mpemba College to David
Actual Infrastructure | Construction of 22m Span Matope Bridge with Associated Drainage Structures and Rehabilitation of Mpemba College to David
| Name of Infrastructure Project | Construction of 22m Span Matope Bridge with Associated Drainage Structures and Rehabilitation of Mpemba College to David |
| Type of Work | Rehabilitation of Mpemba College to |
| Location | Blantyre |
| Start Date | Monday, 02 January 2023 |
| Completion Date | Tuesday, 20 February 2024 |
| Contractor | LD CIVIL ENGINEERING |
| Current Status (%) | 100 |
| Project Cost | MWK |